Home Strip 1 Strip 2 Modding 1 Modding 2 Sponsors
'Micrawave' BBQ Project

The start of the Modifications 09/07/05

All the parts are placed on to get an idea of how the project will look


Paynee hard at work mixing the fibreglass


All the holes are filled


Thats the fibreglass in


Sanding gets underway to remove the sharp edges


The arches and sideskirts are added to the car


Along with the roof vent


A good days work to get the car moving


Continuation of the Modifications 17/07/05

Work on the metalwork continues, the pre-bent sides are placed in and rivitted


Another angle of the inside


Outside of the car is filled and sanded and the first coat of paint goes on to help identify where the blemishes are


Again from another angle


More work on the exterior to get it smooth


At the same time the metalwork is beign fastened in


A set of 15" alloys is added, and the car is lowered for a meaner stance


My most favourite picture of the car at the moment, looks lovely from this angle, full respray soon to come


A final picture of the saxo rear spoiler and the custom roof vent










Hosted by ModdedMicras.co.uk